sheed
23/06/2009, 08:15 AM
السلام عليكم ورحمة الله وبركاته

إخواني إذا حد عنده نسخ من اتفقيات بناء مع مقاولين , الرجاء ارسالهم على الخاص .


مشكورين مقدما

sheed
23/06/2009, 02:52 PM
سبحان الله وبحمده سبحان الله العظيم

سائق الخير
23/06/2009, 04:03 PM
Agreement

This agreement made on 01.01.2009 in between Mr. xxxxxxxxxx (hereinafter called the first party) and M/s. xxxxxxx Co. (hereinafter called the second party, contractor)

Whereas the second party has agreed to carry out the construction at ground fllor 234.66 SqQ. M. first 235.22 Sq. M. and pent house 174/32 Sq. M on plot No. 148 30NE Bousher at Wattayah for the first party as per the following terms and conditions:

Total Built Up Area : 644.20 sq.M

General Specification:

1. Foundation Up to Plinth
As per Drawing and Specifications
Block : Oriental
Steel : Turkey or Oman made
Concrete : Ready mix by Shanfari for footing, plinth & slab and all other concrete site mix

2. Anti Termite Treatment To be done by the specialized company with 10 years Guarantee.

3. Supper Structure As per approved drawing & specifications.

4. Water Proofing and Other Roof Layers Roof Screed to slope
Water proofing to be done by specialized company with 10 years guarantee with white cement tiles.

5. Floor & Wall Tiles Main Entrance and ent. Step – Omani Marble R.O. 6/- Per Sqm.
All other floor Ceramic tile R.O. 2.5/- Per Sqm.
In kitchen, Bathroom & Toilet wall Ceramic R.O. 2.5/- Per Sqm.

6. Painting Inside and Outside Sadolin 77 Plus.

7. Duct Covering GRC Screen R.O. 12/- per Sqm.

8. Door Frame and Shutters Main Door R.O. 300/- each
All Doors R.O. 80/- each
Cost including frame, lock, hinges and polish.

9. Aluminum Works Aluminum Window white color powder coated medium section frame 6mm reflective glass for all bathroom aluminum each R.O. 65/- window each R.O. 45/-.

10. Kitchen Cabinet Kitchen cabinet lump sum R.O. 300/- each

11. Sanitary ware Master Bath set R.O. 200/- each
All other Bath set R.O. 150/- each
All Toilet set R.O. 100/- each
(Cost included all accessories and fittings and mirror.)




12. Service Links Internal pipe lines shall be "Techno pipe" (for hot and cold water)
External services line shall be " HPVC " pipes
Drainage line shall be " UPVC " pipe Oman make 4" size

13. Overhead water Tank 400 gallons in each flat : (Total 5 No.)

14. Electrical services Light lump sum R.O. 700/-
Ceiling fan KDK
Exhaust fan KDK
Water heater Hotex Oman made
All switches & sockets PVC- UK made
Wire – Oman made

15. Staircase steps & handrails Staircase steps - Omani marble – R.O. 6/- per sqm.
MS balustrade and top Meranti wood handrails.

16. Compound wall & Gate As per drawing, small & big size gate R.O. 400/- lumpsum.

17. Septic Tank As per drawing.

18. Interlock Inside of the compound wall (R.O. …. ).

19. Car park Lump sum R.O. 250/- each.

20. Hard rock Cutting and extra backfilling.

21. Other All Cable and panel board .
Demolishing of existing old building.

22. Completion Period 12 Months from getting permission of Municipality.

Total Amount : R.O. ……..

Penalty: R.O. 10.000 Per day if delay the work by second party
















Mode of Payment

Sr NO. Description Percentage % Amount (R.O)
1. Advance 7% 6,000.000
2. After completion of plinth beam and floor concrete 8% 6,500.000
3. After completion of ground floor block work, column and septic tank, soak pit compound wall 5% 4,000.000
4. After completion of ground floor slab 8% 6,500.000
5. After completion of first floor block work and column 5% 4,000.000
6. After completion of 1st floor slab 8% 6,500.000
7. After completion of ground floor inside plaster and parapet wall 8% 6,500.000
8. After completion of roof water proofing and fixing of roof tiles and outside plastering 8% 6,500.000
9. After inside tiles fixing, bath room kitchen wall tiles fixing and sanitary piping complete 8% 6,500.000
10. After completion of electrical wiring and piping inside 5% 4,500.000
11. After completion of sanitary fixing and electrical lights and switches & socket fixing 5% 4,500.000
12. Door & window fixing complete 8% 6,500.000
13. Outside painting and interlock fixing 8% 6,500.000
14. After completion of car parking work and all finishing 8% 6,500.000
Total (R.O) 95% 81,500.000
Retention Money will be released after one year from completion date. 5% 4,500.000
Total Amount (R.O) 100% 86,000.000

The above terms and conditions are agreed by both parties and signed hereunder.






----------------------------------------------------- -----------------------------------------------------

Signature of First Party Signature of Second Party
Mr. Mr. (contractor)

sheed
24/06/2009, 07:25 AM
بارك الله فيك سائق الخير وعسى ان شاء الله تكون دائما سائقا للخير

sheed
27/06/2009, 09:31 AM
للرفع , واذا ممكن بالعربي ( الاتفاقيات)

SUD] 212
07/07/2009, 05:53 PM
نتمنى اتفاقيات بالعربية .

الباحث عن الحقيقة
22/07/2009, 11:32 PM
للرفع , واذا ممكن بالعربي ( الاتفاقيات)
نفس الطلب